Attack Log Gasification Boiler

Woodco Log gasification Boiler by Attack

The ATTACK DPX range of Wood Gasification boilers are designed for economic and cost-effective heating of homes and small businesses. Fuelled by dry wood and pellets, the modern and innovative design allows for burn time up to 8–12 hours.
User-friendly and reliable, the ATTACK boiler range can be used with an optional buffer tank to further increase its efficiency, with longer intervals between refuelling. These log wood gasification boilers are available in outputs of 15 to 80kW, and are 85 – 90% efficient.

Our ATTACK DPX range meets criteria of the highest class under the European norm EN303-5, and so will be eligible for Government Support Scheme for Renewable Heat (SSRH) in Ireland.

Standard Features

  • Quality electronics with fluent PID regulation of fan rotations according to the flue gas temperature

  • High-efficiency tubular exchanger “flue gas-water” with turbulators

  • Burns soft and hard wood and wood briquettes, and capable of burning larger logs – length of the feeding chamber is 580 mm (in models 25 kW and higher)

  • Suction fan for balanced and effective burning, and dustless operation

  • Automatic regulation of the heat-up flap, which is connected with the door of the feeding chamber

  • Fluently modulated fan rotations

  • Automatic boiler stop when fuel burns out, and equipped with aftercooling circuit against overheating of boiler in the water

  • Option of Lambda modification – the most advanced technology for the burning process regulation, which ensures maximum efficiency and low emissions.

  • Option for left or right door

  • Refractory pieces are resistant up to the temperature of 1,350 °C, which ensure better parameters of burning

Technical Information

Attack DPX Log Gasification Boiler diagram

Key

  1. Boiler body
  2. Front upper cover
  3. Feeding door
  4. Door of the combustion chamber
  5. Suction fan
  6. Chimney
  7. Primary air suction
  8. Secondary air suction
  9. Boiler thermostat
  10. Reset of emergency thermostat
  11. Flue gas thermostat
  12. Inlet valve
  13. Main switch
  14. Thermo-manometer
  15. Aftercooling circuit
  16. Cover of the cleaning opening
  17. C.H. flow connection
  18. C.H. return connection
  19. Pull rod of the chimney flap
  20. Lever of turbulators
  21. Control panels
  22. Electrical fuse
Attack DPX Log gasification Boiler dimensions

Downloads